亚洲乱码国产乱码精华|中国亚洲女人69内射少妇|300部国产真实乱|无套熟女av呻吟在线观看|国产网红无码精品福利网

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產與制造

24小時全國服務熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.hawtbg.cn

當前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 精品国产亚洲第一区二区三区| 久久精品av一区二区三| 亚洲国产精品久久久久爰| 性无码专区一色吊丝中文字幕| 亚洲国产成人手机在线电影| 国产欧美另类久久久精品图片| 亚洲精品中文字幕| 精品9e精品视频在线观看| 成年美女看的黄网站色戒| 色欲久久人妻内射| 亚洲乱码一区二区三区在线观看| 精品无人区一区二区三区| 成年日韩片av在线网站| 亚洲gv天堂gv无码男同| 午夜内射中出视频| 大肉大捧一进一出好爽视色大师| 久久精品无码一区二区软件| 国产精品福利视频萌白酱| 精品无码久久久久久久动漫 | 国产韩国精品一区二区三区| 久久人人97超碰超国产| 美乳丰满人妻无码视频| 亚洲欧美综合区丁香五月小说| 国内精品自线一区二区三区| 无码毛片视频一区二区本码| 好爽好黄的视频| 国产美女在线精品免费观看网址 | 一本aⅴ高清一区二区三区| 少妇激情艳情综合小视频| 巨乳人妻久久+av中文字幕| 内射白浆一区二区在线观看| 九九视频在线观看视频6| 日本japanese漂亮丰满| 欧美一进一出抽搐大尺度视频| 波多野结衣不打码视频| 精品午夜久久福利大片| 色喜国模李晴超大尺度| 欧美人牲交免费观看| 免费午夜无码片在线观看影院| 日韩精品无码熟人妻视频| 97超级碰碰碰久久久久app|